Comprehensive knowledge of Cisco 300-560 dumps pdf Others products is considered a very important qualification, and the professionals certified by them are highly valued in all organizations. The best Cisco 300-560 exam dumps training material in PDF format, which is a very common format found in all computers and gadgets.

QUESTION 1
Which two steps are associated with the active portion of the audit when a post-installation audit is performed with an auditing tool such as Ekahau? (Choose two.)
A. Check for co-channel interference by standing near an access point on one channel and watching for other access points that are on the same channel.
B. Verify smooth roaming.
C. Check to see if the signal level on other access points that are heard on the same channel is at least 19dBm weaker than the access point that you are next to.
D. Check that all channels are supported by the APs regardless of client capabilities.
E. Verify that the network traffic of physical data rate and packet loss meets user requirements.
Correct Answer: BE

QUESTION 2
An engineer is performing a predictive wireless design for a Parts Distribution Center which requires data and location services. Which three requirements are inputs to the design? (Choose three.)
A. access points with directional antennas
B. continuous -67 dBm coverage from one access point
C. overlapping -75 dBm coverage from three access points
D. overlapping -67 dBm coverage from two access points
E. access points in IPS mode
F. continuous -72 dBm coverage from one access point
G. accesspointsincornersandalongperimeters
Correct Answer: BCG
300-560
QUESTION 3                 300-560
A customer has deployed an N+N redundant wireless infrastructure. In this deployment the access points have been salt and peppered between controllers.
What configuration would be necessary to cut down on the use of mobility tunnels for voice clients?
A. mobility anchor
B. KIS based CAC
C. media session snooping
D. re-anchor roamed voice clients
Correct Answer: D

QUESTION 4
An engineer is tuning RRM parameters to improve client connectivity. Which channel band results in the best 802.11n client compatibility?
A. UNII-2
B. UNII-2e
C. UNII-3
D. UNII
E. UNII-1
Correct Answer: E

QUESTION 5
An engineer is installing a wireless network in an industrial area with extreme temperatures and a significant amount of dust. Which enclosure should be used to protect the APs?
A. ACU
B. ADU
C. NEMA
D. WLSE
Correct Answer: C

QUESTION 6
What are two advantages of conducting an active survey versus a passive survey when verifying RF coverage? (Choose two.)
A. verifies packet loss
B. verifies roaming
C. verifies SNR
D. verifies signal level
E. verifies interferers
Correct Answer: AB

QUESTION 7
An engineer is deploying an outdoor Mesh network. Which four major factors should be considered? (Choose four.) 300-560
A. power
B. buildings
C. traffic lights
D. satellite dishes
E. line of sight
F. network connectivity
G. power lines
H. mounting
Correct Answer: AEHF

QUESTION 8
An engineer is preparing for an outdoor wireless survey to mesh connect a distant remote building to a connected building.
Which two types of antennas are appropriate for this application? (Choose two.)
A. circular polarized
B. patch
C. dishD. Yagi
E. omni
Correct Answer: CD

QUESTION 9
A customer is deploying a Greenfield 802.11ac network on a foor that will support approximately 300 wireless devices.
Which setting needs to be changed on Prime Infrastructure Planning Tool in order to predict the amount of access points the customer needs to service the new foor?
A. Data Coverage Support Margin
B. Demand Settings
C. Add AP Field
D. 802.11n Protocol Support
Correct Answer: B

QUESTION 10
Which two options describe best practices that must be completed after a wireless installation is finished? (Choose two.) 300-560
A. Make sure that there are no spaces between the devices on the rack that the Wireless Lan Controller isinstalled.
B. Consult with the customer to ensure that the IT staff has a complete set of design and installationdocuments.
C. Make sure the customer is aware that they should consider purchasing a support contract immediately afterthe installationis complete.
D. Spend time with the customer to show them the controller GUI and inform them how they can reach theCisco TAC if they have any problems.
E. Test all the customer’s wireless devices and applications to ensure they are working properly.
Correct Answer: B

Watch the video to learn more:

https://youtu.be/6ecQEViGRFQ

Written By

We are a professional team focused on IT certification exams, committed to providing the most comprehensive and authoritative exam preparation guidance for IT practitioners and learners. We have been deeply involved in the field of IT certification for many years and have a deep understanding of the test points and difficulties of various certification examinations.

Our team is composed of experienced IT experts and technical experts. They are not only proficient in IT technology, but also good at converting complex knowledge points into easy-to-understand content. The preparation materials, analysis of real questions and study methods we provide have been carefully selected and summarized, aiming to help you prepare for the exam efficiently and successfully pass the certification exam.

Our purpose: to help you avoid detours, prepare for exams efficiently, and achieve a better career.

More From Author

You May Also Like

Leads4Pass: Complete 300-410 Dumps Exam Material Upgrade

Leads4pass 300-410 Dumps Exam Solution Updated! Comprehensive upgrade of CCNP Enterprise 300-410 exam materials: In…

Leads4Pass CyberOps Associate 200-201 Dumps 2024 Update

Leads4Pass CyberOps Associate 200-201 Dumps has been updated! It is the latest exam preparation material…

CCNP Enterprise Certification Exam Update | Best Exam Solutions

CCNP Enterprise Certification Exam Update: Before the change: CCNP Enterprise certification consists of the CCNP…